Work

 

Transactions of the Institution of Civil Engineers of Ireland. Volume 33, 1907 Public Deposited

Transactions of the Institution of Civil Engineers of Ireland. Volume 33, 1907

Shelf Mark/Reference Number
  • ICEI vol. 33
Location
Creator
Contributors
DOI
Rights statement
  • Copyright The Board of Trinity College Dublin. Images are available for single-use academic application only. Publication, transmission or display is prohibited without formal written approval of the Library of Trinity College, Dublin.
Publisher location
  • Dublin
  • Ireland
Publisher
Date Created
  • issued 1907
Language
Abstract
  • Transactions of the Institution of Civil Engineers of Ireland. Seventy-Second and Seventy-Third sessions, November, 1905 to May, 1907. Vol. XXXIII. Dublin: Printed for the Institution of Civil Engineers, by John Falconer, 53 Upper Sackville-Street, 1907. Issuing body changes from the Institution of Civil Engineers of Ireland to the Institution of Engineers of Ireland from volume 96 onwards.Liquid fuel by Marmaduke Purcell, Member – Page 1 /Annual General Meeting – Page 22 / The Waterford Main Drainage by J.J. Fleming, Associate Member – Page 22 / President’s Address – Page 30 / Points suggested by the Charing Cross roof failure by W. Norble Twelvetrees –Page 38 / The economic design of column by W.E. Lilly, Member – Page 67 / Buttressed masonry Dams by M.T. Ormsby, Member – Page 94 / Reinforced concrete by Connel W. L. Alexander – Page 137 / Further experiments in plate girders; web stresses in plate girders by W. E. Lilly, Member – Page 181 / Railway signaling and interlocking by J. H. Hargrave, Member – Page 196 / The progress of geodesy by G. T. M’Caw, Associate Member – Page 220 / Report of Council and Accounts for 1905-1907, Auditors’ reports and statements of accounts for 1905-1906. List of members for 1906.PLATES:--Plates 1-4 Waterford main drainage (page 22)--Plates 1 & 2 Points suggested by the Charing Cross roof failure (page 38)--Plates 1-4 Economic design of columns (page 67)--Figures 1- 17 Web stresses in plate girders (page 181)--Figures 1-19 Railway signaling and interlocking (page 196)--Plates 1-5 Process of geodesy (page 220)--Map – Index chart of the Geodetic Survey of South Africa (page 220)
Series title
  • Transactions of the Institution of Civil Engineers of Ireland
Subject
Keyword
Format
Resource type
Medium
  • ink
Support
  • paper (fiber product)
Culture
  • Irish
Digital Object Id
  • ICEI-033_001
Source
  • DCAT0120779

Relationships

Parent works and subseries:

Items